The High Street Proposals

Design Considerations
* Reconsider access for deliveries, with designated times for servicing.
* The existing carriageway construction is considered to be poor and this should be considered at the detailed design stage.
* Sewer vents are located in the existing carriageway.
* Delineation of the carriageway needs to be carefully considered to avoid the use of large number of bollards or other street furniture, given that reintroducing kerbs, a preferred design solution would be costly.
* New paving needs to consider the levels within the High Street and the need to provide additional drains to control run-off, northwards, down the High Street.
* Where possible the paving in adjoining alleys should be coordinated with new paving within the High Street
View Plan
View Axonometric |